top of page

CHECKLIST

Checklist (To Do’s & Double Checks) Before we arrive for template and/or install

Template checklist

Secure Cabinets . Level and verify

If you have new cabinets, ensure the cabinets are completely level, securely anchored to the walls, and structurally ready. Once we come out to template, the cabinets cannot move.

Appliance Garage or Corner towers

If you have a corner tower or appliance garage, that needs to be cleared out and removed from the cabinets and wall before template. Your countertops run under or your tower sits on your current tops.

We cannot tearout your current tops with that tower there without damage. We typically cannot install new countertops under it due to possible thickness differences and the safety of the install.

Clear Countertops and clear area

If you have existing cabinets that are not changing with current countertops, please clean and clear off everything that is currently sitting on the countertops. ie: Air fryers, blenders, nicnacks, decorative items, cutting boards, food items ect.

Sink info or Sink Set

If you have a standard undermount sink, make sure you have the sink on site or the sink information. 

​

If you have a "Farm-sink" make sure it is mounted in place BEFORE the template.

Farms-sinks MUST BE in place before we can template. If the templator arrives and the Farm-sink is NOT in place, we will NOT be able to template, we will have to re-scheduled your template appointment which can lead to delays in your job install.

Be Home

Plan on being home or ensure a contractor or adult decision-maker (someone over the age of 18) is present during the scheduled arrival window. Someone need to be there in case the templator has any questions, need a review, confirm faucet hole placements ect.

Install checklist

Disconnect Utilies

Turn off and disconnect water supply lines, drains, gas lines, or hardwired electrical connections for sinks, cooktops, and ranges.

(Stone Concepts are licensed plumbers or electricians)

(We will Not/Can-NOT disconnect anything for you)

If our installers get to the house and utilities are NOT disconnected, we will not be able to install the job. We will have to re-schedule for the next available date.

(which could be up to another week or two out depending on how full our schedule is)

Clear Countertop and Surrounding Area

If you have existing current or existing countertops, please clean and clear off everything that is currently sitting on the countertops. ie: Air fryers, blenders, nicnacks, decorative items, cutting boards, food items ect.

Apliance Garage or Corner Tower

If you have a corner tower or appliance garage it needs to be cleared out and removed from the cabinets and wall before install. Your countertops run under or your tower sits on your current tops.

We cannot tearout your current tops with that tower there without damage. We typically cannot install new countertops under it due to possible thickness differences and the safety of the install.

Access and Pathways

Clear any unobstructed path from your front door or driveway to the area the countertop will go to so heavy slabs and tools can be moved safely.

Reserve driveway space or street for the installer's vehicle and outdoor staging area.

Secure pets and children. Move pets to a safe, enclosed area away from the work zone and keep children clear.

Be Home

Plan on being home or ensure a contractor or adult decision-maker (someone over the age of 18) is present during the scheduled arrival window. Someone need to be there in case the templator has any questions, need a review, confirm faucet hole placements ect.

bottom of page